The FAB CE/EU Consultation took place in Prague on April 29th.
October 2012
FAB CE Response to observations submitted during EC Consultation Process
FAB CE has duly considered the observations in accordance with Commission Regulation (EU) No 176/2011 and has put together a detailed and thorough response to the observations made during the EC Consultation Process. The overall added value of all FAB CE projects has also recently been summarized in a detailed document.
Overall added value of all FAB CE Projects
Common Response document
Abbreviations
May/June 2012
European Commission Consultation Process - Commission Regulation (EU) 176/2011
Functional Airspace Blocks (FABs) shall be implemented by 4 December 2012. Currently, we have entered the consultation phase.
As part of FAB implementation and to facilitate an exchange of views, Member States in all FAB initiatives will consult other Member States, the European Commission, EASA, and other "interested parties". The consultation material of all FABs shall be submitted to the European Commission.
Please find below the presentations prepared for EC Consultation Meeting on June 8.
- FLC presentation
- NSA CC presentation
- JCMACC presentation
- CEOC presentation
- PM Overview presentation
- OPS SC presentation
- TEC SC presentation
- SAF SC presentation
- FAB CE Safety Case
- FIN SC presentation
- HR SC presentation
Please find below the documents submitted by FAB CE to the European Commission for consultation:
Annexes:
- Annex_1_FABCE_Agreement_signed
- Annex_2_NSA_Cooperation_Agreement
- Annex_3_FABCE_COOP_AG_FINAL_SIGNED
- Annex_4_DRAFT_JCMACC_TOR_ver 3.1
- Annex_5_FABCE_PMO_0.2_001_FAB CE Master Plan 01_02
- Annex_6_FABCE-SAA_V5_1a_00_02b
- Annex_7_FABCE_SAF_6.2_001_FAB CE FS Safety Case 01_00
- Annex_8_FABCE_PREP_SAF_6_2_002_Initial Safety Assessment Report for Static AoR scenario_01_00
- Annex_9_FABCE_PREP_OPS_1_8_001_FAB CE Operational Concept for Static AoR scenario 01_00a
- Annex_10_FABCE_PREP_OPS_1_2_002_FAB CE ASM_ATFCM integration process_01_00a
- Annex_11_FABCE_PREP_OPS_1_1_003_FAB CE Airspace Plan 2012-15_01_00a
- Annex_12_FABCE_PREP_OPS_1_1_002_FAB CE Capacity Plan 2012-15_01_00a
- Annex_13_FABCE_FNOP_V12c
- Annex_14_Airspace Charter FAB CE V01 00
- Annex_15_FABCE_Principles for airspace design criteria_V 1.1
- Annex_16_FAB CE NationalASM ATFCM inte by SV(FIN-2)
- Annex_17_FABCE_PREP_PMO_ISIS_002_FAB CE ISIS 1.0
- Annex_18_FAB-DOC-EC31CK-1.2a-0_ProgramManagementPlan_PgMP_SAP
- Annex_19_FABCE_PREP_FIN_3_2_005_ANSP Performance Assessment Report_01_00
- Annex_20_FABCE_FIN_3_5_001_FAB CE Cost Benefit Analysis 01_01
- Annex_21_FABCE_PREP_OPS_1_4_001_FAB CE Operational Requirements for Static AoR_01_00a
- Annex_22_FAB CE ACID Roadmap 2011-2014 v0.6
- Annex_23_fab sd charter_final_all signatures
- Annex_24_01.00_FABCE_compliance_update_150312
- Annex_25_FABCE_PREP_SAF_6_3_001_SMS Roadmap_01_00a
- Annex_26_FABCE_PREP_PMO_IP_002_FAB CE Implementation Plan_01_00a
- Annex_27_FABCE_PREP_OPS_1_3_002_FAB CE Contingency Plan for Static AoR 01_00a
- Annex_28_FABCE_PREP_FIN_3_2_005_ANSP Performance Assessment Report_01_00
- Annex_29.0_FABCE_PREP_ILR_5_3_001_Legal Analysis of the ANSPs Cooperation _01_00
- Annex_29.1_FABCE_PREP_ILR_5_3_001 ANSP Cooperation - Annex 1 - Examples from Master Plan_01_00
- Annex_29.2_FABCE_PREP_ILR_5_3_001_ANSP cooperation - Annex 2 - ANSP cooperation areas - Implementation Plan_01_00
- Annex_29.3_FABCE_PREP_ILR_5_3_001_ANSP cooperation - Annex 3 - Agreement on provision of ATS_01_00
- Annex_29.4_FABCE_PREP_ILR_5_3_001 ANSP Cooperation - Annex 4 - Cooperation Agreement _01_00
- Annex_30_FABCE_PREP_TEC_2_4_001_TEC Implementation Plan 01_00a
- Annex_31_FABCE_PREP_FIN_3_2_003_FAB CE Performance Framework - Deliverable 1_00_02
- Annex_32_FAB-DOC-AP31SN-1.0b-0_FABCE_Report_on_safety_policy
- Annex_33_FAB CE_PMP_Live_trial_FINAL version_1.1_16.03.2012
- Annex_34_FAB CE Airspace Plan 2012 v15