The ASM/ATFCM integrated process was recognized as a key element to improve FAB CE operation by 2015. Within FAB CE this project was set up to investigate how regional ASM/ATFCM processes can be integrated and implemented.

This included:

- Analysis of the current situation
- Validation of possible solutions for improvements through simulations and trials
- Live Trial (May 2012) and Real Time Simulation (October 2012)
- Support the development of validation and implementation process in the FAB CE
- Production of ASM operational requirements to achieve consistency for the region

Final report - recommendations (2013-2015)

The recommendations of the final report include among other points the continued harmonization and upgrades of National ASM/ATFCM systems for 2013 – 2015 and the development of harmonized integrated FAB CE ASM/ATFCM processes, based on the results of the Live Trial.

In terms of safety assessment activities, the main focus will be on reviewing and validating the assumptions made within the scope of the preliminary safety assessment activities during the pre-implementation and implementation phase as well as carrying out detailed pre-implementation safety assessment of the particular integration model selected for implementation.